{"id":3437,"date":"2026-08-27T15:54:30","date_gmt":"2026-08-27T10:24:30","guid":{"rendered":"https:\/\/blog.statiq.in\/?p=3437"},"modified":"2026-08-27T15:55:14","modified_gmt":"2026-08-27T10:25:14","slug":"statiq-apex-ev-charger","status":"publish","type":"post","link":"https:\/\/blog.statiq.in\/2026\/08\/27\/statiq-apex-ev-charger\/","title":{"rendered":"Introducing\u00a0Statiq\u00a0Apex: A New Generation of EV Charging\u00a0\u00a0"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">There is a point where an EV charging station stops being just a place to plug in.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When&nbsp;you&#8217;re&nbsp;running a highway charging stop, managing a fleet, or adding charging to a commercial property, the charger becomes part of the site&#8217;s daily operation. Cars arrive. Drivers want to leave quickly. Multiple vehicles may need&nbsp;charging. The equipment has to stay connected,&nbsp;safe&nbsp;and ready to work.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is the kind of environment the&nbsp;<strong>Statiq&nbsp;Apex EV Charger<\/strong>&nbsp;is built for.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The APEX V5 is a&nbsp;<strong>120-kW&nbsp;DC fast charger<\/strong>&nbsp;designed for commercial EV charging infrastructure. It comes with dual CCS2 outlets, smart network connectivity, a floor-mounted design for indoor or outdoor deployment, and a range of built-in protection systems.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let&#8217;s&nbsp;look at the APEX V5 in more detail.&nbsp;&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What Is the&nbsp;Statiq&nbsp;Apex EV Charger?<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The&nbsp;Statiq&nbsp;Apex EV Charger is a&nbsp;<strong>120 kW&nbsp;DC fast charger<\/strong>&nbsp;designed for high-demand commercial charging locations.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Unlike an AC charger, where the vehicle&#8217;s onboard charger&nbsp;generally handles&nbsp;the conversion from AC to DC, a DC fast charger supplies DC power directly to the vehicle&#8217;s battery system. That&nbsp;allows&nbsp;significantly faster charging, provided the vehicle can accept the available power.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The APEX V5 supports an output voltage range of&nbsp;<strong>150\u20131000 VDC<\/strong>&nbsp;and up to&nbsp;<strong>200A maximum output current<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It also comes with&nbsp;<strong>two CCS2 charging outlets<\/strong>, making it suitable for locations where more than one compatible EV may need access to charging infrastructure.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The important detail here is the word&nbsp;<em>maximum<\/em>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A&nbsp;120 kW&nbsp;charger&nbsp;doesn&#8217;t&nbsp;mean every EV will continuously charge at 120 kW. Actual charging speed depends on the vehicle&#8217;s charging capability, battery state of charge, battery temperature, and the charging system&#8217;s power management. A vehicle that accepts 60 kW&nbsp;won&#8217;t&nbsp;suddenly take 120 kW because the charger is rated for it.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That distinction matters when&nbsp;you&#8217;re&nbsp;planning a commercial charging station.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Where Does a&nbsp;120 kW&nbsp;DC Charger Make Sense?<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Think about where drivers actually stop.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A fleet vehicle might pull into a depot between shifts. A highway&nbsp;traveller&nbsp;may want enough charge to continue a long journey without spending an hour parked. Someone visiting a commercial property may want to charge while they shop,&nbsp;work&nbsp;or have a meal.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These are different use cases, but they have one thing in common:&nbsp;<strong>time matters<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The APEX V5 is designed for environments such as:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Highway charging stations and rest areas\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fleet charging locations\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Retail and commercial parking spaces\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hotels and hospitality properties\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Office and commercial complexes\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Other high-demand public or semi-public charging locations\u00a0<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">India&#8217;s current EV charging infrastructure guidelines specifically cover charging infrastructure across private parking, semi-restricted locations such as offices and group housing societies, public&nbsp;places&nbsp;and highways\/expressways.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So&nbsp;the site matters just as much as the charger.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A powerful charger installed in a location with little traffic&nbsp;won&#8217;t&nbsp;necessarily make a good business. A well-selected site with consistent EV movement can be&nbsp;a very different&nbsp;story.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>APEX V5: The Features That Matter on Site<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Specifications are useful.&nbsp;Knowing what they mean when the charger is actually operating is even more useful.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>120 kW DC Fast Charging<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">APEX V5 delivers up to&nbsp;<strong>120 kW of DC fast charging power<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a commercial charging operator, that gives compatible vehicles access to high-power charging without requiring them to remain parked for unnecessarily&nbsp;long periods.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The actual charging curve will still vary by vehicle. Most EVs&nbsp;don&#8217;t&nbsp;pull maximum power throughout the entire charging session.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Dual CCS2 Charging Outlets<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The APEX V5 comes with&nbsp;<strong>dual CCS2 connectors<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That gives a charging site two charging outlets from the same charger platform, supporting compatible CCS2-equipped EVs.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For an operator, this becomes particularly relevant when vehicles arrive close together.&nbsp;A charging station should be planned around actual traffic patterns rather than simply the number printed on the equipment.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Indoor and Outdoor Installation<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">APEX V5 is a&nbsp;<strong>floor-mounted charger designed for indoor and outdoor deployment<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That&nbsp;opens up&nbsp;several possibilities, from dedicated charging hubs and fleet depots to commercial parking areas and highway locations.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Outdoor installation, however,&nbsp;isn&#8217;t&nbsp;simply a matter of placing the charger outside and connecting&nbsp;power.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The site still needs proper electrical infrastructure, civil works, vehicle access, drainage considerations, protection from accidental impact,&nbsp;signage&nbsp;and safe cable routing. Public charging station requirements also cover areas such as electrical works, adequate charging and vehicle movement space, and fire protection.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Good charger placement is easy to overlook until the first few vehicles arrive.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Leave enough room for vehicles to enter, position themselves, connect the cable and leave without creating a traffic problem.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Smart Network Connectivity<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">APEX V5 supports&nbsp;<strong>OCPP v1.6<\/strong>, along with&nbsp;<strong>Ethernet, 3G, 4G and Wi-Fi connectivity<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a connected charging network, that allows the charger to communicate with backend systems for remote management and monitoring.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For an operator managing chargers across&nbsp;different locations, remote visibility can save a lot of unnecessary site visits.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Protection for Demanding Environments<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">APEX V5 carries&nbsp;<strong>IP55 ingress protection and IK10 enclosure protection<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These ratings are particularly relevant when equipment is installed in commercial environments where dust, water&nbsp;exposure&nbsp;and physical impact are practical concerns.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The charger is also specified to&nbsp;operate&nbsp;between&nbsp;<strong>-30\u00b0C and +55\u00b0C<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That wide operating range is useful when&nbsp;you&#8217;re&nbsp;considering charging infrastructure across different climatic conditions.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Still, protection ratings&nbsp;don&#8217;t&nbsp;remove the need for sensible site planning.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A charger exposed to direct weather, standing water, poor drainage or repeated vehicle impact is dealing with&nbsp;a very different&nbsp;environment from a well-designed charging bay.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Equipment matters.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Installation&nbsp;matters&nbsp;too.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Safety&nbsp;Isn&#8217;t&nbsp;a Checkbox<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A fast charger handles substantial electrical power. Safety&nbsp;has to&nbsp;be designed into the system rather than treated as an afterthought.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">APEX V5 includes multiple protection systems, including:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Overcurrent protection\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Short-circuit protection\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Overvoltage protection\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Undervoltage protection\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ground fault detection\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Internal residual current detection\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Smoke detection\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Insulation monitoring\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Over-temperature protection\u00a0<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These features are there to detect abnormal operating conditions and help protect the charging system.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">India also has specific electrical safety requirements for EV charging infrastructure. The Central Electricity Authority&#8217;s regulations include provisions covering dedicated protection, earth continuity monitoring, fire prevention,&nbsp;testing&nbsp;and maintenance records for EV charging stations.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What Does Installation Actually Involve?<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If&nbsp;you&#8217;re&nbsp;considering an APEX V5 for your property,&nbsp;don&#8217;t&nbsp;start with the charger.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Start with the site.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. Check the site<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">First, look at how vehicles will enter, park,&nbsp;charge&nbsp;and exit.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A highway station needs easy access from the road. Similarly, a\u00a0hotel\u00a0or commercial property needs charging bays that work naturally with existing parking and vehicle movement.\u00a0<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2. Check electrical capacity<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A&nbsp;120 kW&nbsp;DC charger needs suitable electrical infrastructure.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The available electrical load, connection, distribution equipment,&nbsp;cabling&nbsp;and protection systems should be assessed before installation.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3. Plan civil works and commissioning<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The charger needs a suitable installation area and foundation, along with&nbsp;appropriate electrical&nbsp;cabling and protection.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cable routing matters too. You&nbsp;don&#8217;t&nbsp;want&nbsp;charging&nbsp;cables creating unnecessary obstacles around a busy parking area.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before opening the charger to customers, the installation should be tested and commissioned according to applicable requirements and the manufacturer&#8217;s instructions.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Statiq&#8217;s&nbsp;installation and setup team can handle the installation and guide operators through charger operation.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Is APEX V5 Suitable for Your EV Charging Business?<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">That depends on how you plan to&nbsp;operate&nbsp;the station.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Statiq&nbsp;offers two broad business models for charging infrastructure.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Model 01: Franchise Owned, Company Operated \u2014 FOCO<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This model is aimed at investors,&nbsp;MSMEs&nbsp;and businesses that want to&nbsp;participate&nbsp;in EV charging while using&nbsp;Statiq&#8217;s&nbsp;operational&nbsp;expertise.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The stated investment range starts at&nbsp;<strong>\u20b930 lakh and can go up to \u20b93 crore<\/strong>, depending on the station configuration.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The model includes:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>DC fast charging stations from 60 kW to 360 kW\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Scalable parking bays\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Charger deployment and technology integration support\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Technical monitoring and uptime support\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Branding\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>App visibility\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Access to the\u00a0Statiq\u00a0ecosystem\u00a0<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The&nbsp;important point&nbsp;is that the investment&nbsp;isn&#8217;t&nbsp;simply the cost of the charger.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A charging station is a complete infrastructure project. Land, electrical connection, civil work, parking capacity,&nbsp;connectivity&nbsp;and operations all affect the final investment.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Model 02: Outright Purchase \u2014 Direct<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This&nbsp;option&nbsp;is designed for businesses that want ownership and greater control over their charging infrastructure.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It can suit:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hotels\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fleet operators\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Commercial properties\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Businesses with existing parking infrastructure\u00a0<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The model includes complete charger ownership, branding flexibility, flexible pricing and billing, and EPC support for charging infrastructure setup.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you already own the property and want charging to become another part of your business operation, outright ownership can be worth evaluating.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What Should You Check Before Buying a DC Fast Charger?<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Don&#8217;t&nbsp;compare chargers only by power.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask:&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can my site support the required electrical load?<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How many EVs do I realistically expect each day?<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How long do vehicles typically stay at the location?<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Do I need one charger or multiple charging bays?<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What connectivity is available?<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How will the charger be&nbsp;monitored&nbsp;remotely?<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What safety protections are included?<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Who will handle installation and commissioning?<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What happens when the charger needs service?<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These questions usually tell you more than a brochure headline.&nbsp;&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>APEX V5 Technical Specifications&nbsp;<\/strong>&nbsp;<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Specification&nbsp;<\/strong>&nbsp;<\/td><td><strong>Details&nbsp;<\/strong>&nbsp;<\/td><\/tr><tr><td>Model&nbsp;&nbsp;<\/td><td>APEX V5 120 kW DC Fast Charger&nbsp;&nbsp;<\/td><\/tr><tr><td>Maximum Output Power&nbsp;&nbsp;<\/td><td>120 kW&nbsp;&nbsp;<\/td><\/tr><tr><td>Output Connectors&nbsp;&nbsp;<\/td><td>Dual CCS2&nbsp;&nbsp;<\/td><\/tr><tr><td>Output Voltage Range&nbsp;&nbsp;<\/td><td>150\u20131000 VDC&nbsp;&nbsp;<\/td><\/tr><tr><td>Maximum Output Current&nbsp;&nbsp;<\/td><td>Up to 200A&nbsp;&nbsp;<\/td><\/tr><tr><td>Installation&nbsp;&nbsp;<\/td><td>Floor Mounted, Indoor \/ Outdoor&nbsp;&nbsp;<\/td><\/tr><tr><td>Protection Rating&nbsp;&nbsp;<\/td><td>IP55, IK10&nbsp;&nbsp;<\/td><\/tr><tr><td>Connectivity&nbsp;&nbsp;<\/td><td>Ethernet, 3G, 4G, Wi-Fi&nbsp;&nbsp;<\/td><\/tr><tr><td>Payment Support&nbsp;&nbsp;<\/td><td>App-Based, Card-Based, UPI-Based&nbsp;&nbsp;<\/td><\/tr><tr><td>Operating Temperature&nbsp;&nbsp;<\/td><td>-30\u00b0C to +55\u00b0C&nbsp;&nbsp;<\/td><\/tr><tr><td>Display&nbsp;&nbsp;<\/td><td>15.6-inch TFT LCD&nbsp;&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Frequently Asked Questions<\/strong>&nbsp;<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Where can the APEX V5 charger be installed?<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">APEX V5 is designed for commercial EV charging environments including fleet charging stations, highway rest areas, retail parking spaces,&nbsp;hotels&nbsp;and commercial properties.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>How fast is the&nbsp;Statiq&nbsp;Apex EV Charger?<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">APEX&nbsp;V5 has a maximum DC output power of&nbsp;<strong>120 kW<\/strong>. Actual charging speed depends on the EV&#8217;s charging capability, battery&nbsp;condition&nbsp;and other charging-system factors.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Can APEX V5 be&nbsp;monitored&nbsp;remotely?<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. APEX V5 supports Ethernet, 3G, 4G and Wi-Fi connectivity, along with OCPP v1.6 for charger management and backend communication.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What is the minimum investment to start a&nbsp;Statiq&nbsp;charging station franchise?<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The stated FOCO investment starts from&nbsp;<strong>\u20b930 lakh<\/strong>, depending on the charger configuration, number of&nbsp;bays&nbsp;and site requirements. Larger deployments can require higher investment.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Final Thoughts<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">EV charging is moving beyond the idea of simply putting a charger wherever there is parking.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The infrastructure has to work around real journeys, real&nbsp;traffic&nbsp;and real operating conditions.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Highway&nbsp;travellers&nbsp;want faster stops. Fleet operators need predictable charging. Businesses want infrastructure that fits their property. Operators need visibility when something goes wrong.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The&nbsp;Statiq&nbsp;Apex EV Charger is designed with those requirements in mind.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.statiq.in\/contact-us\" data-type=\"link\" data-id=\"https:\/\/www.statiq.in\/contact-us\"><strong><em>Looking to set up a commercial EV charging station? Explore APEX V5 with\u00a0Statiq\u00a0and evaluate the right configuration for your location.\u00a0<\/em><\/strong>\u00a0<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>There is a point where an EV charging station stops being just a place to plug in.&nbsp; When&nbsp;you&#8217;re&nbsp;running a highway charging stop, managing a fleet, or adding charging to a commercial property, the charger becomes part of the site&#8217;s daily operation. Cars arrive. Drivers want to leave quickly. Multiple vehicles may need&nbsp;charging. The equipment has [&hellip;]<\/p>\n","protected":false},"author":268594793,"featured_media":3439,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_wpcom_ai_launchpad_first_post":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"{title}\n\n{excerpt}\n\n{url}","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false,"jetpack_post_was_ever_published":false},"categories":[1490,1492],"tags":[1956,1982,1984],"class_list":["post-3437","post","type-post","status-publish","format-standard","has-post-thumbnail","category-ev-industry-insights","category-company-announcements","tag-dc-fast-charger","tag-ev-charging-station","tag-statiq-apex-ev-charger"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Statiq Apex EV Charger: 120 kW DC Fast Charger | Statiq<\/title>\n<meta name=\"description\" content=\"Discover the Statiq Apex V5 120 kW DC fast charger, built for highways, fleets, commercial properties and high-demand EV charging locations.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Statiq Apex EV Charger: 120 kW DC Fast Charger | Statiq\" \/>\n<meta property=\"og:description\" content=\"Discover the Statiq Apex V5 120 kW DC fast charger, built for highways, fleets, commercial properties and high-demand EV charging locations.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/\" \/>\n<meta property=\"og:site_name\" content=\"Statiq\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-27T10:24:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-27T10:25:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blog.statiq.in\/wp-content\/uploads\/2026\/08\/1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Archa B\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Archa B\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/\"},\"author\":{\"name\":\"Archa B\",\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/#\\\/schema\\\/person\\\/15758f306ed0ce11f66aad4c34b5e131\"},\"headline\":\"Introducing\u00a0Statiq\u00a0Apex: A New Generation of EV Charging\u00a0\u00a0\",\"datePublished\":\"2026-08-27T10:24:30+00:00\",\"dateModified\":\"2026-08-27T10:25:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/\"},\"wordCount\":2107,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/blog.statiq.in\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/1.webp?fit=1672%2C941&ssl=1\",\"keywords\":[\"dc fast charger\",\"ev charging station\",\"statiq apex ev charger\"],\"articleSection\":[\"EV Insights\",\"Statiq News\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/\",\"url\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/\",\"name\":\"Statiq Apex EV Charger: 120 kW DC Fast Charger | Statiq\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/blog.statiq.in\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/1.webp?fit=1672%2C941&ssl=1\",\"datePublished\":\"2026-08-27T10:24:30+00:00\",\"dateModified\":\"2026-08-27T10:25:14+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/#\\\/schema\\\/person\\\/15758f306ed0ce11f66aad4c34b5e131\"},\"description\":\"Discover the Statiq Apex V5 120 kW DC fast charger, built for highways, fleets, commercial properties and high-demand EV charging locations.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/blog.statiq.in\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/1.webp?fit=1672%2C941&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/blog.statiq.in\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/1.webp?fit=1672%2C941&ssl=1\",\"width\":1672,\"height\":941,\"caption\":\"Electric car charging at a highway station using Statiq Apex EV Charger, a 120 kW DC fast charger.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/2026\\\/08\\\/27\\\/statiq-apex-ev-charger\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/statiq.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Introducing\u00a0Statiq\u00a0Apex: A New Generation of EV Charging\u00a0\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/statiq.in\\\/blog\\\/\",\"name\":\"Statiq\",\"description\":\"India&#039;s Largest EV Charging Network\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/statiq.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/statiq.in\\\/blog\\\/#\\\/schema\\\/person\\\/15758f306ed0ce11f66aad4c34b5e131\",\"name\":\"Archa B\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3875ca524969c2d69db461e8de6820780ad74beacb6380fee48e64e21926ceb4?s=96&d=identicon&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3875ca524969c2d69db461e8de6820780ad74beacb6380fee48e64e21926ceb4?s=96&d=identicon&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3875ca524969c2d69db461e8de6820780ad74beacb6380fee48e64e21926ceb4?s=96&d=identicon&r=g\",\"caption\":\"Archa B\"},\"url\":\"https:\\\/\\\/statiq.in\\\/blog\\\/author\\\/archabe4eed97df4\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Statiq Apex EV Charger: 120 kW DC Fast Charger | Statiq","description":"Discover the Statiq Apex V5 120 kW DC fast charger, built for highways, fleets, commercial properties and high-demand EV charging locations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/","og_locale":"en_GB","og_type":"article","og_title":"Statiq Apex EV Charger: 120 kW DC Fast Charger | Statiq","og_description":"Discover the Statiq Apex V5 120 kW DC fast charger, built for highways, fleets, commercial properties and high-demand EV charging locations.","og_url":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/","og_site_name":"Statiq","article_published_time":"2026-08-27T10:24:30+00:00","article_modified_time":"2026-08-27T10:25:14+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/blog.statiq.in\/wp-content\/uploads\/2026\/08\/1.webp","type":"image\/webp"}],"author":"Archa B","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Archa B","Estimated reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/#article","isPartOf":{"@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/"},"author":{"name":"Archa B","@id":"https:\/\/statiq.in\/blog\/#\/schema\/person\/15758f306ed0ce11f66aad4c34b5e131"},"headline":"Introducing\u00a0Statiq\u00a0Apex: A New Generation of EV Charging\u00a0\u00a0","datePublished":"2026-08-27T10:24:30+00:00","dateModified":"2026-08-27T10:25:14+00:00","mainEntityOfPage":{"@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/"},"wordCount":2107,"commentCount":0,"image":{"@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/08\/1.webp?fit=1672%2C941&ssl=1","keywords":["dc fast charger","ev charging station","statiq apex ev charger"],"articleSection":["EV Insights","Statiq News"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/","url":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/","name":"Statiq Apex EV Charger: 120 kW DC Fast Charger | Statiq","isPartOf":{"@id":"https:\/\/statiq.in\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/#primaryimage"},"image":{"@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/08\/1.webp?fit=1672%2C941&ssl=1","datePublished":"2026-08-27T10:24:30+00:00","dateModified":"2026-08-27T10:25:14+00:00","author":{"@id":"https:\/\/statiq.in\/blog\/#\/schema\/person\/15758f306ed0ce11f66aad4c34b5e131"},"description":"Discover the Statiq Apex V5 120 kW DC fast charger, built for highways, fleets, commercial properties and high-demand EV charging locations.","breadcrumb":{"@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/#primaryimage","url":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/08\/1.webp?fit=1672%2C941&ssl=1","contentUrl":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/08\/1.webp?fit=1672%2C941&ssl=1","width":1672,"height":941,"caption":"Electric car charging at a highway station using Statiq Apex EV Charger, a 120 kW DC fast charger."},{"@type":"BreadcrumbList","@id":"https:\/\/statiq.in\/blog\/2026\/08\/27\/statiq-apex-ev-charger\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/statiq.in\/blog\/"},{"@type":"ListItem","position":2,"name":"Introducing\u00a0Statiq\u00a0Apex: A New Generation of EV Charging\u00a0\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/statiq.in\/blog\/#website","url":"https:\/\/statiq.in\/blog\/","name":"Statiq","description":"India&#039;s Largest EV Charging Network","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/statiq.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/statiq.in\/blog\/#\/schema\/person\/15758f306ed0ce11f66aad4c34b5e131","name":"Archa B","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/3875ca524969c2d69db461e8de6820780ad74beacb6380fee48e64e21926ceb4?s=96&d=identicon&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3875ca524969c2d69db461e8de6820780ad74beacb6380fee48e64e21926ceb4?s=96&d=identicon&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3875ca524969c2d69db461e8de6820780ad74beacb6380fee48e64e21926ceb4?s=96&d=identicon&r=g","caption":"Archa B"},"url":"https:\/\/statiq.in\/blog\/author\/archabe4eed97df4\/"}]}},"jetpack_publicize_connections":[],"jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/peRuTF-Tr","jetpack-related-posts":[{"id":3388,"url":"https:\/\/blog.statiq.in\/2026\/06\/30\/statiq-ev-charging-network-india\/","url_meta":{"origin":3437,"position":0},"title":"Statiq\u00a0EV Charging Network: Complete Guide to India\u2019s Growing EV Charging Ecosystem\u00a0","author":"Archa B","date":"30th June 2026","format":false,"excerpt":"Have you ever thought about charging uncertainty before buying an EV?\u00a0Where will you charge? Will the charger be available when you get there? What if\u00a0it\u2019s\u00a0occupied, offline, or too far from your route?\u00a0 For many EV buyers, these questions come up early because charging still feels less predictable than traditional\u00a0refuelling.\u00a0\u00a0 With\u2026","rel":"","context":"In &quot;EV Insights&quot;","block_context":{"text":"EV Insights","link":"https:\/\/blog.statiq.in\/category\/ev-industry-insights\/"},"img":{"alt_text":"Statiq EV charging network across India with 10,000+ chargers and real-time charger map visibility.","src":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/02.webp?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/02.webp?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/02.webp?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/02.webp?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/02.webp?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":3405,"url":"https:\/\/blog.statiq.in\/2026\/07\/13\/ev-charging-infrastructure-india\/","url_meta":{"origin":3437,"position":1},"title":"How Is India&#8217;s EV Charging Infrastructure Evolving for EV Adoption?\u00a0","author":"Archa B","date":"13th July 2026","format":false,"excerpt":"You may be surprised by how quickly EV charging infrastructure in India has evolved.\u00a0 Just a few years ago, public charging stations were\u00a0limited,\u00a0long-distance travel required careful planning, and home charging options were still developing. Today, the landscape looks\u00a0very different.\u00a0 The shift is being driven by rising EV adoption. According to\u2026","rel":"","context":"In &quot;EV Insights&quot;","block_context":{"text":"EV Insights","link":"https:\/\/blog.statiq.in\/category\/ev-industry-insights\/"},"img":{"alt_text":"Public EV charging infrastructure in India with a DC fast charging station for electric vehicles","src":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/07\/Untitled-1.webp?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/07\/Untitled-1.webp?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/07\/Untitled-1.webp?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/07\/Untitled-1.webp?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/07\/Untitled-1.webp?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2269,"url":"https:\/\/blog.statiq.in\/2023\/02\/10\/how-much-time-does-it-take-to-charge-an-electric-car\/","url_meta":{"origin":3437,"position":2},"title":"How Much Time Does It Take To Charge An Electric Car?","author":"Team Statiq","date":"10th February 2023","format":false,"excerpt":"Electric vehicles are becoming popular day by day as people are becoming more environmentally conscious, and switching to electric cars is enabling them to contribute their part to protect the environment. However many people still resist adopting electric mobility in their day-to-day transportation due to EV car charging time and,\u2026","rel":"","context":"In &quot;EV Insights&quot;","block_context":{"text":"EV Insights","link":"https:\/\/blog.statiq.in\/category\/ev-industry-insights\/"},"img":{"alt_text":"Electric car is charging","src":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2023\/02\/how-long-does-it-take-to-charge-an-electric-car-header.webp?fit=1200%2C400&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2023\/02\/how-long-does-it-take-to-charge-an-electric-car-header.webp?fit=1200%2C400&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2023\/02\/how-long-does-it-take-to-charge-an-electric-car-header.webp?fit=1200%2C400&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2023\/02\/how-long-does-it-take-to-charge-an-electric-car-header.webp?fit=1200%2C400&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2023\/02\/how-long-does-it-take-to-charge-an-electric-car-header.webp?fit=1200%2C400&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":3295,"url":"https:\/\/blog.statiq.in\/2026\/06\/01\/ev-charging-near-wonderla-bangalore\/","url_meta":{"origin":3437,"position":3},"title":"Looking for EV Charging Near\u00a0Wonderla\u00a0Bangalore?\u00a0Here&#8217;s\u00a0a Convenient Stop\u00a0\u00a0","author":"Archa B","date":"1st June 2026","format":false,"excerpt":"If you drive an EV in\u00a0Bangalore, you already know the routine.\u00a0 A quick outing rarely stays quick.\u00a0 A 30-minute drive turns into an hour. Weekend traffic builds up before you even leave the city. And somewhere between checking Google Maps and planning your route, you start doing battery math in\u2026","rel":"","context":"In &quot;Statiq News&quot;","block_context":{"text":"Statiq News","link":"https:\/\/blog.statiq.in\/category\/company-announcements\/"},"img":{"alt_text":"Public EV Charging Station Near Wonderla Bangalore","src":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/1200x675px-resize.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/1200x675px-resize.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/1200x675px-resize.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/1200x675px-resize.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/1200x675px-resize.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":3353,"url":"https:\/\/blog.statiq.in\/2026\/06\/15\/choose-the-right-ev-charging-station\/","url_meta":{"origin":3437,"position":4},"title":"How Do You Choose the Right EV Charging Station for Your Electric Car?","author":"Archa B","date":"15th June 2026","format":false,"excerpt":"Choosing the right EV charging station starts with understanding your car\u2019s charging compatibility, how long the vehicle will stay parked, and how quickly you need the charge. To choose the right EV charging station, it\u2019s important to match your charging needs with your daily driving routine. For daily charging, slower\u2026","rel":"","context":"In &quot;EV answers&quot;","block_context":{"text":"EV answers","link":"https:\/\/blog.statiq.in\/category\/ev-answers\/"},"img":{"alt_text":"Electric car at a charging station illustrating how to choose the right EV charging station for charging speed, compatibility, and convenience.","src":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/Artboard-3-1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/Artboard-3-1.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/Artboard-3-1.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/Artboard-3-1.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/06\/Artboard-3-1.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":3245,"url":"https:\/\/blog.statiq.in\/2026\/05\/14\/how-long-to-charge-electric-car\/","url_meta":{"origin":3437,"position":5},"title":"How Long Does It Take to Charge an Electric Car?\u00a0","author":"Team Statiq","date":"14th May 2026","format":false,"excerpt":"Electric car charging can take anywhere from\u00a030 minutes to overnight. The actual time depends on your battery size, the charger\u00a0you\u2019re\u00a0using, and how much charge is left when you plug in. Most EV owners simply plug in at night and wake up to a fully charged car. On road trips, a\u2026","rel":"","context":"In &quot;EV answers&quot;","block_context":{"text":"EV answers","link":"https:\/\/blog.statiq.in\/category\/ev-answers\/"},"img":{"alt_text":"How long does it take to charge an electric car illustration showing battery capacity divided by charging power to calculate EV charging time","src":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/05\/Charging_time.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/05\/Charging_time.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/05\/Charging_time.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/05\/Charging_time.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/05\/Charging_time.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/blog.statiq.in\/wp-content\/uploads\/2026\/08\/1.webp?fit=1672%2C941&ssl=1","_links":{"self":[{"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/posts\/3437","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/users\/268594793"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/comments?post=3437"}],"version-history":[{"count":2,"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/posts\/3437\/revisions"}],"predecessor-version":[{"id":3440,"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/posts\/3437\/revisions\/3440"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/media\/3439"}],"wp:attachment":[{"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/media?parent=3437"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/categories?post=3437"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.statiq.in\/wp-json\/wp\/v2\/tags?post=3437"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}